Hinds Community College first approached us with a very tight timeline for fixtures. We sensed their urgency and jumped on a plane the next day for a site visit and consultation. Once we understood what type of products they would be selling, we quickly suggested fixture options for their review.
We provided 3D models of each fixture as well as black and white drawings detailing all the specifications. An order was issued and AWI completed the entire project within five weeks. Three tractor trailers delivered to their campus in Raymond, MS and we installed the job in three days.
Hinds Community College was in desperate need of an update to their Raymond, MS campus. The bookstore had an outdated color scheme and their displays had seen better days.
AWI got to work on a 3D model with plans to update the entire store. We designed a custom art supply display, checkout counters, and a variety of floor fixtures all with modern finishes.
Through a joint effort between Hinds Community College and AWI, we reached a final design in which both parties were ready to move to manufacturing. We manufactured and installed the project in a timely fashion. The team at Hinds was so pleased with the result that they sent our team home with gift bags full of goodies!!!